Parking Structure Projects
|
Craig A. Woods, RA
LEED Accredited Professional
Big Bear Shopping Center. Provided design,
construction documentation and consultant
coordination for a two-story, partially subterranean,
parking structure serving a mixed-use project
incorporating a Big Bear Market and two-story office
building at the second level.
Sharp Grossmont Hospital Medical Office Building,
La Mesa, California
Huntington Hospital Outpatient Services Pavilion,
Pasadena, California
City of Beverly Hills Operations Service Center,
Beverly Hills, California
St. Jude Medical Office Building, St. Joseph
Healthcare, Fullerton, California
East Village Square, San Diego, California. A Carrier
Johnson + Culture Project
Produced designs and grading studies for
approximately 500 parking spaces in a multilevel,
subterranean, parking structure under the office and
retail portion of the San Diego Padres Ballpark.
Concept included parking under the façade of an
historic building, kept in place during construction as
a requirement of the historic preservation component
of the Ballpark District.
AmeriSuites Hotel, San Diego, California. A Carrier
Johnson + Culture Project
Provided conceptual design and documentation as
part of the San Diego Ballpark District Master Plan.
Concept included street level retail uses, multistory
parking structure for 280 cars, terrace pool area and
196 guest units in a 10- story structure.
Intracorp 12th and G Mixed-Use Project, San Diego,
California. A Carrier Johnson + Culture Project
Provided conceptual designs and documentation for
entitlements from the Center City Development
Corporation for a five story retail/condominium project
in the Center City area. This project contained one
story of subterranean parking, one story of street level
enclosed parking with retail lease space and four
stories with 60 one- and two-bedroom
condominiums.
Intracorp 4th Avenue and J Street Mixed-Use
Project, San Diego, California. A Carrier Johnson +
Culture Project
Provided conceptual designs and documentation for
entitlements from the Center City Development
Corporation for a six story retail/condominium project
in the Center City area. This project contained two
stories of subterranean parking, one story of street
level enclosed parking with retail lease space, and
five stories with condominiums. Fronting on the
Chinese/Asian Thematic Historic District on 4th
Avenue and the Gaslamp Quarter Historic District on
5th Avenue, this concept provided a transition
between the two districts by changing scale and
articulating subtle changes from one district to the
next.






